info@deanepublicworks.com +44 28 6862 1555

Notice
  • Folder doesn't exist or doesn't contain any images

Maghery Replacement Footbridge

Project Information:

Client: DRDNI Road Service

Value: £11.0M

Completion: 2007

 

Project Overview

Key Features:

  • 3.3km of 2-lane, all purpose single carriageway.
  • The new line consists of one single lane 7.3m wide carriageway.
  • Construction of Dublin Road Bridge and Drumragh River Bridge structures.
  • Design and construction of 10M high retaining walls
  • Construction of slip roads and roundabouts.
  • Reconstruction of Crevenagh Road and Irishtown Road.
  • Tie-ins with existing roads and local accommodation works.
  • Construction of car-parks and cycle paths.

This complex project situated at Omagh, County Tyrone consisted of the construction of a new road running between the south end of the existing OmaghThrough pass and a new junction on the A5 Dublin Road including construction of a Road Bridge structure and a River Bridge structure. 

The A5 serves as one of the five Key Transport Corridors and the main communications artery for a significant population; Omagh Throughpass Stage III was an important and integral part of the overall upgrading of this route.

The purpose of the scheme was to alleviate traffic congestion on the Southern and Eastern approaches to Omagh Town and to allow through traffic unrestricted passage through Omagh Town. 

Contact Us

Head Office

16 Tully Road
Burninubber
Killadeas
Irvinestown
County Fermanagh
Northern Ireland
BT94 1FB

+44 (0) 28 6862 1555