Client: Waterways Ireland

Value: £1.97M

Project Overview

Key Features:

  • Earthworks / Site clearance including removal of overgrown vegetation
  • Excavations and Realignment of the existing Royal Canal
  • Demolition of existing disused concrete bridge & culvert crossing
  • New reinforced insitu box culvert & wing walls 36m long, 7m wide & 5m high
  • New embankments & re-grading (25000m3)
  • New road alignment including tie-ins & regrading of existing access roads
  • New amenity area including car parking facility
  • Control of existing watercourse by temporary damming & 900mm dia by-pass culvert, 70m long.
  • Drainage including 980m of 300mm dia concrete pipes & 14No manholes
  • Geotextiles to embankments (6035m2)
  • Cell-web slope protection (1500m2)
  • Pavement construction & road surfacing (7000m2)
  • Landscaping (13000m2)

The restoration of the Royal Canal at Mosstown, Keenagh, Co Longford encompassed the removal of the existing large culverted road crossing & Island Bridge & replacement with a new reinforced concrete fixed bridge / box culvert.

The site was bounded by an existing roadway, two access road ways, the Canal & agricultural lands. Other works included extensive embankment construction / new vertical road alignment, incorporating drainage, safety fencing, public lighting & services provision, road markings & signage, pavement construction & road surfacing.

There was also accommodation works to create an amenity area & access to properties affected by the works as well as extensive realignment of the canal including the installation of a canal liner.

The Puddle clay material was sampled & tested in accordance with BS 1377 (1990) & BS 5930 (1981) & was approved for use by Waterways Ireland prior to installation.

The works required careful management of the watercourse & detailed environmental plans were agreed with Longford County Council

The project took 32 weeks to complete and by increasing our site workforce at key stages, ensured the successful delivery of the works on time and within budget.

Contact Us